In this process, a round gap is excavated up to the depth at which the soil will stand unsupported (about 0.5m for tender clay and 2m for rigid clay). Vertical boards generally known as laggings, are then established in posture across the excavated facial area and are held tightly against the soil by steel rings.• Friction and Bearing – Deep fo